Topic: How to get a useful progress report?
Poster: Mikhail Kropotov
Post title: Additional observations
[quote]Thomas T. Frost wrote:
Is there anything unusual in the TM setup? Did you check in the TM that the confirmed segments have actually been written to it? If the segments were confirmed but not written to the TM (or if the TM was not attached), it would be consistent with your result.
[/quote]
Your comment made me double-check and compare the different projects I have been working with.
As it turns out, the behavior I described in my original post is easier to replicate on a customer's remote server project rather than on my own local ones. It seems that on a remote server project, even when I select the checkbox "Project TMs and corpora" in the Statistics dialog, the analysis is calculated as if the checkbox were deselected. Perhaps the server TM is in a different state from my local one, and the checkbox doesn't work as expected.
Still, I could swear that when I posted originally, it was because the issue was happening on a local project of mine, not on a remote server project. With a local project there's only one TM, the local one, and it should theoretically always be up-to-date.
I haven't gotten to the bottom of this issue yet, but I'll keep a close eye on it. If/when I figure it out, I'll update this topic.
Thank you everyone for your input and feedback!